Anji Khad Rail Bridge: India’s First Cable-Stayed Railway Bridge

Anji Khad Rail Bridge: India’s First Cable-Stayed Railway Bridge

  • The Anji Khad Rail Bridge is situated in the Reasi district of Jammu and Kashmir.
  • It is India’s first cable-stayed railway bridge.
  • The bridge is an engineering marvel and a significant part of the Udhampur-Srinagar-Baramulla Rail Link (USBRL) project.
  • Its primary objective is to improve connectivity to the Kashmir Valley.

Design and Structure

  • Cable-Stayed Design: The bridge features a single pylon rising 193 meters from its foundation, supporting a 473.25-meter span with 96 cables—48 on each side—providing stability and strength.
  • Dimensions: The total length of the bridge is 725.5 meters, including a 120-meter ancillary viaduct on the Reasi side and a 38-meter approach bridge on the Katra end. The deck, 15 meters wide, accommodates a single railway line, a service road, and footpaths.
  • Height: Standing at 331 meters above the riverbed, the bridge is among the tallest in the world, second only to the Chenab Bridge in India.

Engineering Challenges and Solutions

  • Geological Complexity: The construction site is characterized by complex geological features, including faults, folds, and seismic activity. Detailed investigations by IIT Roorkee and IIT Delhi led to the implementation of a hybrid foundation at the Katra end to stabilize the slopes, ensuring structural integrity.
  • Advanced Construction Techniques: Innovative methods such as DOKA jump form shuttering and pump concreting systems were employed, reducing construction time by approximately 30%. A state-of-the-art tower crane, imported from Spain, facilitated construction at heights up to 193 meters.

Safety and Monitoring Systems

  • Integrated Monitoring: The bridge incorporates an advanced integrated monitoring system with numerous sensors installed throughout its structure. These sensors monitor the bridge’s health during its service life, ensuring safety for users.
  • Earthquake Resilience: Considering the region’s seismic activity, the bridge is designed to withstand wind speeds up to 213 km/h and includes measures to ensure stability during earthquakes.

Construction Milestones

  • Pylon Completion: The construction of the main pylon was completed in March 2021.
  • Cable Installation: All 96 cables were installed by April 2023, marking a significant milestone in the bridge’s construction.
  • Trial Runs: A successful trial run of a tower wagon was conducted in December 2024, bringing the project closer to completion.

Impact on Connectivity

  • Transportation Boost: Enhances transportation in Jammu and Kashmir.
  • Improved Access: Provides better connectivity to the Kashmir Valley.
  • Tourism Promotion: Encourages tourism growth in the region.
  • Economic Growth: Contributes to the region’s economic development.
  • Infrastructure Milestone: Marks a key achievement in India’s infrastructure development.
  • Valley Integration: Brings the Kashmir Valley closer to the rest of the country.

Important questions

  1. Where is the Anji Khad Rail Bridge located?
  2. What is the primary objective of the Udhampur-Srinagar-Baramulla Rail Link (USBRL) project?
  3. How tall is the pylon of the Anji Khad Rail Bridge?
  4. What advanced construction techniques were used to build the bridge?
  5. How does the Anji Khad Rail Bridge ensure safety in a seismically active region?

Conclusion

The Anji Khad Rail Bridge exemplifies India’s engineering prowess and commitment to enhancing connectivity in challenging terrains. As the first cable-stayed railway bridge in the country, it sets a precedent for future infrastructure projects, demonstrating that with innovation and determination, even the most formidable engineering challenges can be overcome.

 