Home GIPSA Promotion GIPSA PE 1-5 Previous Year Questions

GIPSA PE Officer Scale 1 to 2 Memory based Paper: 17 December 2023

GIPSA Promotion Exam Officer Scale 1 to 2: Previous Year based Question December 2023

GIPSA conducts GIPSA PE officer Scale 1 to 2 examination. We provide Memory based Questions of GIPSA PE officer Scale 1 to 2.

In these papers, maximum questions are repeated in every exam. So, Ambitious baba is providing you with GIPSA PE officer Scale 1 to 2 Memory based Question 2023. These Memory based Questions of GIPSA PE officer Scale 1 to 2 will be very useful in upcoming Exam.

These Previous years Questions GIPSA PE Officer Scale 1 to 2  will be very useful in upcoming Exam.

Join Telegram Group for GIPSA Promotion Exam

 

GIPSA Promotion Exam

Click here  to Buy GIPSA MAHACOMBO

Scale I to II Questions asked – (17 December 2023)

Motor

  • Imt 29
  • Imt 22
  • Gr 23
  • Dumper
  • Numerical
  • Numerical
  • Numerical
  • Numerical
  • Vintage car – agreed value
  • Max TPPD limit
  • Liability with fire and theft – cannot be issued to D type vehicles
  • C1 – geographical zone
  • Geographical extension
  • Class D excess
  • Side car
  • Imt 21
  • Open air car parks
  • Geographical area in case of motor trade policy
  • Overturning
  • Private car clause
  • Section 150
  • Appeal in high court time period
  • Form 51
  • 2 policies with claim on 1 policy – refund
  • GCV premium depends on
  • Section 161 max death amount

Miscellaneous

  • PA – education fund
  • PA – education fund
  • PLI Act
  • Jeweller block section IV
  • PLI numerical
  • Industrial risk numerical
  • CGL Policy
  • Cattle insurance
  • Plate glass
  • Aarogya sanjeevani co pay
  • Aarogya sanjeevani si
  • Medical expenses extension is add on
  • PA – benefit section and indemnity section
  • Critical illness numerical
  • Money insurance numerical
  • Fidelity guarantee numerical
  • Fidelity guaratee is claim payable
  • Fidelity guarantee numerical
  • SIP full form
  • Product liability insureds
  • Negligence
  • Bankers indemnity who among the following cannot be the insured

MARINE

  • Notice of claim in days for Road
  • ICC C – Reasonably attributable to
  • ICC B – Earthquake and stow fell
  • War cover 15 days
  • ITC A – AIR
  • Open policy
  • Not Bulk cargo – Tea
  • 1 ques
  • 1 ques
  • Excess not applicable to TL/CTL
  • Gross sale proceed numerical
  • GA question
  • Marine policy is assignable unless
  • ICC B – Rain Water Damage not covered
  • Hull question on what is in insured’s control? options – Nuclear risks,
  • ITC – Duration of cover
  • Collison liability
  • Marine policy valued

FIRE 

New product

  • Excess in Lagu
  • Difference between Sookshma and Griha
  • Theft  within  7  (seven  )days  from  the  occurrence  of  and any  of  the  Insured  Event
  • Earthquake in Griha inbuilt cover
  • 10% Escalation in Griha form date of commencement
  • Question regarding Spontaneous combustion in new product

Engg

  • Minimum EXCESS in BPP-10000
  • Testing in EAR
  • ALL risk policy EEI
  • First installment 5% more
  • Time execs MLOP 14 DAY
  • SFSP
  • Department clause in ALOP
  • Debris Removal (in excess of 1%)
  • Architects,  etc Fees 3% claim to 7.5% claim
  • Earthquake position when STFI deleted
  • This extension is for non manufacturing premises only under material damage (Fire Policy); excluding building of kutcha construction; unfit for occupation; for a maximum  period  of indemnity not to exceed THREE years.  (36 MONTHS )
  • Escalation The premium charged is 50%  of the final  rate on the specified increase  in sum insured.
  • Contract Price Insurance Clause
  • Which is not Standing charges
  • ADD on in FLOP
  • Standard Turnover
  • Spontaneous combustion higher rate -IV
  • Question Regarding Fire Extinguishment Systems
  • Under insurance numerical
  • ANNUAL TURNOVER used to find Under-insurance
  • Project policy

REINSURANCE QUESTIONS 

  • Reinsurance is contract between— Reinsurer and Reinsured.
  • Meaning- Captive company
  • Profit commission meaning
  • Objective of reinsurance programme
  • Two risk warranty in which type of reinsurance
  • New organisations prefer which type of reinsurane?
  • Consideration for renisurance- Reinsurance premium
  • Retrocessionaire meaning?
  • Ronting meaning- Transfer of entire risk to reinsurer
  • Follow the fortunes– Reinsurance subject to same terms and conditions of original insurance
  • CBR-
  • Overriding commission
  • Borderaux..?
  • Sum insured 6L , PML 20%, Quota share 10%, Net retention 2000, Surplus 4 L. Claim 1L
  • What is reinsured amount
  • Minimum and deposit premium in -Excess of loss
  • Find No of line reinsurers numerical
  • Fire and PA-Accounting year besis
  • SI 10m, pml 20%, retention 1L, Quota share 10%, claim 1m. Reinsured ammount ?
  • SI 1L, PML 20%, QS 10%, NEt retention 5000, Surplus traty 2L, loss 8k
  • What is reinsured amount ?
  • Xs 250mx50m, ROL 40% for 150mx100m.
  • Premium?
  • Engineering Insurance- type of Reinsurance
  • Which of the following covers is sought for protection against an aggregation of losses arising from a common event such as flood?
  • Which of the following reinsurance contract insurer needs to obtain reinsurance coverage before accepting to insure a client?
  • Rate are inversely proportional to retention. Question Incorrect option Low retention low premium rate than High retention
  • Claim attached method

Download App for GIPSA Study Material 2024

GIPSA Promotion Exam MAHACOMBO (Bilingual) : Complete Video Course & Mock Tests for GIPSA Officer Scale 1 to 5 (6 Subjects)

GIPSA Promotion Exam MAHACOMBO (English Medium) : Complete Video Course & Mock Tests for GIPSA Officer Scale 1 to 5 (6 Subjects)

Click here to Fill the Details if you want Counselling from GIPSA Study Materials

GIPSA Promotion Exam 2023

3

2 COMMENTS

  1. If I want to prepare for scale 1 to scale 2 promotional exam for 2026 how to purchase the materials to accelerate the preparation.

Leave a Reply

Discover more from Ambitious Baba

Subscribe now to keep reading and get access to the full archive.

Continue reading